When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Vertical wood siding installation instructions.
Masonry walls masonry walls require furring strips for horizontal and.
Sheathing is desired nail siding to furring strips table 4.
For example if the total expansion equals 3 4 3 8.
Videos you watch may be added to the tv s watch history and influence tv recommendations.
View all product literature.
Vertical corner boards are generally installed before the wood siding so that the siding butts snugly against its edge.
Then install the corner posts that came with your siding and nail j channel along the top and bottom of the wall.
So instead of allowing equal space for expansion at both ends of a vertical panel leave more space at the lower end.
On center table 4.
Check your local code to verify requirements.
Vertical board batten siding installation instructions pg 2 2 if installing pocketed trim at the bottom of the course it is recommended to drill 3 16 weep holes in the bottom of the channel every 18 24 to allow for moisture to escape.
Allow for 1 3 of the total expansion at the top of a panel and 2 3 of the total expansion at the bottom.
Prefinished lap joint siding.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Download our helpful installation instructions and watch our informative how to videos.
It s important that you understand all of the steps involved including what precautions you should to take to ensure it is installed properly.
This is particularly important for vertical installation.
To avoid this cancel and sign in to youtube on.
The siding is fitted against door and window casings in the same way.
The installation process is also faster with horizontal siding so if you want to take on a fast and easy project that gives your home a facelift horizontal siding is a good match for that type of project.
Vertical siding applied to stud walls with or without sheathing requires horizontal nailers blocking or other wood framing members spaced not exceeding 24 in.
In a vertical siding installation most of the expansion is downward.
To install vertical metal siding start by applying horizontal furring strips and sheathing to the surface you re working on if it s uneven.
To accomodate expansion and contraction always leave a 1 4 gap.
If corner boards are not used the siding boards of adjacent walls extend to meet in a mitered joint at the corner.
Tn 028 vertical siding.