Building regs suggest i need a structural calculation for that do you guys agree.
Vaulted ceiling insulation building regs.
Ceilings and expo sed floors r value wall r value floor r value base ment wall r value slab perim eter r value and depth 0 39 r 37a r 13 r 19 r 10 10 4 feet for si.
If the roof has no ceiling then the insulation can be placed between the rafters and ventilation maintained as described above in which case the ridge should also have vent tiles installed to allow for through.
Celotex xr4000 150mm between rafter insulation with 25mm air gap 12 5mm plasterboard.
And how else would i make the roof supported if im going for a vaulted ceiling without cross joists.
The limiting u value the maximise u value which cannot be exceeded required under current building regulations for the roof is 0 20w m.
Ie what size straps masonry hangers etc.
Building regulations standards set the levels of thermal insulation required when carrying out building work either for new build or refurbishment projects.
Finally traditional fiberglass insulation works well in cathedral ceilings although a 2 inch breathing space between the insulation and the roof sheathing must be included.
R 30 ceiling insulation may be used in place of r 37 if the insulation achieves the full r value over the entire ceiling area i e not compressed over exterior.
Any other materials that i need.
If you decide to construct a vaulted ceiling check with your local office regarding building permits and consult with an experienced structural engineer to ensure safety.
These are expressed as a u value which needs to be achieved.
Insulation can be placed between the ceiling joists.